??天天电玩城??

Teaching equipment production company> Professional teaching equipment company> Supply teaching equipment Beijing teaching equipment sales teaching equipment series teaching equipment price

Teaching Equipment
Teaching Equipment

Hydraulic and pneumatic PLC control experiment bench
Engineering hydraulic transmission training platform
Pneumatic PLC control training platform
Engineering hydraulic and pneumatic PLC comprehensive control experiment bench
Hydraulic and pneumatic test bench
Hydraulic test bench
Industrial excavator hydraulic experimental training platform
Hydraulic loading machinery training experimental bench
Transparent hydraulic PLC control training device
Hydraulic system of excavator and PLC control training device
Intelligent belt test bench
Hydraulic transmission jack-type demonstration device
Electro-hydraulic servo test bench
Electro-hydraulic ratio comprehensive test bench
Transparent hydraulic teaching forklift
Lifting machine training platform
Bulldozer training experimental bench
Hydraulic and pneumatic PLC control experimental device
PLC- controlled transparent hydraulic transmission demonstration system training device
Four-in-one hydraulic drive demonstration system experimental bench
Hydraulic component disassembly training platform
Hydraulic PLC control training device system
Hydraulic test bench
Hydraulic training platform
Hydraulic experimental device
Pneumatic PLC control experiment bench
Pneumatic PLC control training platform
Pneumatic PLC control experiment system device
Experimental platform for transparent hydraulic transmission and PLC control training device
Transparent hydraulic and pneumatic PLC control integrated transmission training device experimental bench
??天天电玩城?? Teaching Equipment

FT-A Industrial Excavator Hydraulic Experiment Training Platform

FT-A Industrial Excavator Hydraulic Experiment Training Platform

product detailed information

I. Overview <br /> This device uses industrial hydraulic components and anti-leakage pipes, which can truly demonstrate the excavator working device's digging, unloading, lifting and other actions. The control method includes manual and PLC basic circuit training. It is suitable for the teaching and training needs of "hydraulic transmission", "hydraulic and pneumatic transmission" courses of mechanical and electrical majors in colleges and technical colleges. Three-phase power supply with leakage protection, DC power supply with over-current protection, the system rated pressure is 6.3Mpa.

Technical parameters
1. Input power: three-phase five-wire, AC380V Tolerance ± 10%, 50Hz;
2. Device capacity: ≤2kVA;
3. Working environment temperature: - 5 ℃ ~ 40 ℃;
4. Working humidity: ≤90% (at 40 ℃);
5. Hydraulic pumping station:
(1) The rated pressure of the system is 6.3MPa;
(2) Variable vane pump-1 set of motor: integrated installation with inner shaft, low noise; variable vane pump: rated flow 8L ∕ min, pressure 7MPa; motor: AC 380V voltage, power 1.5kVA.
6. Electrical control unit (1) PLC host module: The host uses Mitsubishi FX1S-20MR host, 12 inputs and 8 relay outputs.
(2) Equipped with control modules: power supply module, PLC host control module, PLC control button module, etc.
Third, the main features
1. Excavator hydraulic system and PLC training device are mainly composed of excavator training platform, hydraulic pump station, hydraulic components and manual control devices, programmable controller (PLC) and other components.
2. The excavator training platform is an iron double-layer matte dense grain spray-painted structure.
3. Through mechanical control, advanced PLC automatic control and PLC programming and monitoring technology are integrated into one to realize its functions flexibly.
Fourth, the main function:
1. Observation and disassembly training of hydraulic transmission components and working principle;
2. Principle study and analysis of hydraulic control system;
3, excavator simulation role, bucket and stick combination for work training;
4. Slewing operation, the boom is lifted and the platform is rotated;
5. Unloading operation, arm and bucket work at the same time, the boom can adjust the position height;
6. Return, platform rotation, boom and stick cooperation to return to the start of excavation;
7, PLC instruction programming, ladder diagram learning experiment;
8. Learning application of PLC programming software;
9, PLC and computer communication and online debugging;
10. PLC application in hydraulic transmission control and optimization experiment of control scheme;
V. Excavator hydraulic system and PLC control training device

Serial number

Name

Type

Quantity

1

Excavator training device

1000 × 800 × 780mm

1 set

2

PLC host module

Mitsubishi FX1S-20MR

1 piece

3

Power module

1 piece

4

PLC host module

1 piece

5

PLC control button module

1 piece

6

Lifting cylinder

1

7

Elbow cylinder

1

8

Bucket cylinder

1

9

Three-position four-way solenoid directional valve

4 only

10

Three-position four-way manual reversing valve

4 only

11

Curved arm

1

12

Straight arm

1

13

Bucket

1

14

Base bracket

1 set

15

Rotary table

1 set

16

Rotary motor

1

17

Pump set

Pumping station system

1 set

18

L-HL46 hydraulic oil

30L

19

Programming cable (adapter)

Mitsubishi

1

20

Excavator hydraulic training manual

1 volume

twenty one

CD-ROM (PLC programming software, program software)

1 plate

twenty two

tool

1 set

??天天电玩城?? | About JingGong | Products | Contact Us Honesty, Excellent Quality, Technological Innovation, Welcome to patronize
Site Navigation: Teaching Equipment Map Tags Keywords: Teaching Equipment
Copyright :: Beijing · Beijing Engineering Science & Education Equipment Co., Ltd. Production Base: No. 9 Nanxiao Street, Jiugong Development Zone, Beijing Hotline: 010-87966065 .. 87917759 Fax: 010-87917759
Teaching Lathe E-mail: bjhjwy@bjhjwy.com QQ: 787608606
七乐彩 韦德足球 欢乐拼三张 欢乐拼三张